PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued saw cutting Rahway Ave. under the bridge (800x600).jpg Excavating for the underground Tela-Data Facing the Administration Building (800x600).jpg Excavation for the Tela-data Facing East side of New buidling  (800x600).jpg Installing underground sanitary sewer Facing North (800x600).jpg Slip forms at Elev. 4 (4th Floor) Facing South-West (800x600).jpg Started installing the underground piping for the Tela-Data Facing the Administration building (800x600).jpg
Previous pageNext page Slip forms at Elev. 4 (4th Floor) Facing South-West (800x600)
Slip forms at Elev. 4 (4th Floor) Facing South-West (800x600)